PROCEDURES FOR APPLICATION FOR LICENSE TO CONSTRUCTION FACTORY IN INDUSTRIAL PARK

 

The procedure for applying for a factory building permit is always a big question for Vietnamese investors as well as foreign investors to invest in building factories in Vietnam. GM Construction Joint Stock Company with many years of experience in the field of building factories and applying for construction permits, would like to present a few notes on the procedure for applying for a construction permit in the hope that it can partly answer the questions. Questions from investors during the process of applying for a permit to carry out the construction of the factory.

 

PROCEDURES FOR APPLICATION OF FACTORY CONSTRUCTION PERMIT

 

Step 1: Prepare the required documents.

– Step 2: Submit the application at the Receipt and Return Department of the People’s Committee of the commune or ward.

– Step 3: The City Urban Management Department receives the dossier and conducts verification and submits it to the City People’s Committee for licensing.

– Step 4: Organizations and individuals receive permits at the Department of receiving and returning results of the City People’s Committee. The factory building process you need to know

Appraisal time – receiving the license from 10 – 15 days. Instructions on how to apply for a factory construction permit

Instructions on how to apply for a factory construction permit

Instructions on how to apply for a factory construction permit

DOCUMENTATION FOR FACTORY CONSTRUCTION LICENSE

 

  1. An application form for a construction permit (made according to the form in Appendix 6 (form 1) of Circular 10/2012/TT-BXD, dated December 20, 2012 of the Ministry of Construction).In case of application for a temporary construction permit with a definite term, the application for a construction permit must also contain a commitment to demolish the work itself when the State conducts ground clearance (01 original);
  2. A certified true copy of one of the papers on land use rights as prescribed by the land law (the certificate of land use right or the decision on land recovery and allocation of the competent authority or the sublease contract land with a record of land allocation in the field);papers on work ownership, in case of repair or renovation;power of attorney, in the case of being authorized by the work owner to repair or renovate (01 copy);
  3. Decision approving environmental impact assessment (for projects requiring environmental impact assessment) or Certificate of commitment to environmental protection (for projects requiring only environmental protection commitments) – according to the provisions of the Law on Environmental Protection and the Decrees guiding its implementation (01 copy);
  4. Design drawings made by qualified organizations or individuals and have been appraised and approved by the investor in accordance with regulations (02 originals).Each set includes:

Instructions on how to apply for a factory construction permit

– Plan drawing of the location of the work on the land lot, the ground of the land lot boundary, the plan drawing (for works along the line), the diagram of connection to the technical infrastructure outside the fence of the work (transportation). ventilation and drainage);

– Drawings of the main plans, elevations and sections of the work;

– Drawing of foundation plan, foundation section, drawings of main load-bearing structures (foundation, frame, wall, load-bearing roof); Instructions on how to apply for a factory construction permit

– Approved drawings of fire prevention and fighting system for works on the list of which require appraisal and approval of fire and explosion prevention and fighting plans according to the provisions of the law on fire prevention and fighting;

– For the case of repair or renovation, there must be drawings of the location and items to be renovated, if there is an effect on the structure of the work, a report on survey results and quality assessment must be provided. old structure related to renovation items and reinforcement measures to determine eligibility for repair and renovation, enclosed with photos of the current status of the work applying for a renovation permit and adjacent works.

Instructions on how to apply for a factory construction permit

Instructions on how to apply for a factory construction permit

Instructions on how to apply for a factory construction permit

  1. Business Registration Certificate (for DDI Enterprises) or Investment Certificate (for FDI enterprises establishing new enterprises with the project) (01 copy);
  2. Project approval decision (of the investor) enclosed with the investment approval document of the competent authority, written opinions on the basic design (if any) of the state management agency. as prescribed (01 original);
  3. Report on appraisal results and written approval of technical design or construction drawing design of investor according to regulations;A report on verification of design results made by a state management agency in charge of construction or a qualified consulting organization according to regulations, enclosed with drawings of main load-bearing structures with signatures and stamps. seal of the design organization or individual;
  4. The investor’s written approval of construction measures to ensure safety for the works and neighboring works, for construction works with basements (01 original);
  5. The declaration of capacity and experience of the design organization, the individual who is the design leader or chairperson (01 original) (made according to the form in Appendix 9 to Circular No. 10/2012/TT-BXD dated on December 20, 2012 of the Ministry of Construction providing detailed instructions on a number of contents of the Government’s Decree No. 64/2012/BD-CP dated September 4, 2012 on the issuance of construction permits), enclosed with a copy of the Decree No. attesting to the practicing certificate of the design manager or chairperson.

Above are the required procedures when applying for a permit to build a factory in an industrial park. Investors can consult and prepare in advance to make the licensing process faster and easier.  Experience in Construction of Pre-Engineered Steel Buildings

COMMUNICATIONS

VIXCONS

– Address: 22 Nguyen Trung Ngan, Ben Nghe Ward, District 1, Ho Chi Minh City, VietNam

– Phone: +84-846-79-4444 Fax: +84-822-246-444

– Email: Info@vixcons.com

– Website: http://vixcons.com/

Xem thêm : Office furniture In Vietnam

Contact us